Description
From Palm Harbor to South St. Petersburg, $15+ million in projects to replace several bridges in Pinellas County are facing uncertain futures and causing headaches for those who live nearby.
While the projects are being overseen by different municipalities, they all share a common link with the contractor hired to do the job, Miami-based American Empire Builders.
The Crosswinds Bridge in Palm Harbor (Pinellas County), the Oakwood Drive Bridge in Harbor Bluffs (Pinellas County), the Tanglewood/Bayou Grande Boulevard Bridge in St. Petersburg’s Shore Acres neighborhood and the 9th Street S/MLK Jr. St. Bridge (FDOT) have all been delayed for months.
►Subscribe: https://on.wtsp.com/youtube
►Website: https://www.wtsp.com/
►Facebook: https://facebook.com/10TampaBay
►Twitter: https://twitter.com/10TampaBay